收藏本站|Message|Sitemap中文Englishwelcome to visit our website!
Hotline:400-026-98340769-26980237
Location: Home > 新闻动态 > 公司新闻 > 正文

The correct installation method of worm gear reducer and worm gear rod elevator

Pubdate:2018-07-27 10:29:16   Hits:4960   【Large Moderate Small
The correct installation method of worm gear reducer and worm gear rod lifter:

The first step is to confirm whether the motor and the reducer are intact before installation, and strictly check whether the dimensions of the parts connected by the motor and the reducer match. Here are the dimensions of the motor positioning bump, the input shaft and the reducer groove and the matching tolerance.

The second step is to screw down the screw on the outer dust hole of the reducer flange, adjust the PCS system clamping ring to align the side hole with the dust hole, and insert the inner hexagonal screw. After that, remove the motor shaft key.

The third step is to connect the motor to the reducer naturally. The concentricity between the output shaft of the reducer and the input shaft of the motor must be ensured and the outer flange of the two shafts is parallel. As the heart is not consistent, it will cause the motor shaft to break or gear reducer wear.

In addition, it is strictly prohibited to use hammers and other strikes during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the bolts before tightening the mounting bolts. Before installation, wipe the rust-proof oil from the motor input shaft, the positioning bump and the connecting part of the reducer with gasoline or sodium zinc water. The purpose is to ensure the tightness and flexibility of connection, and to prevent unnecessary wear and tear. Before the connection between the motor and the reducer,

Please set the motor shaft key slot perpendicular to the tightening bolt. To ensure uniform force, first screw the installation bolts at any diagonal position, but do not screw them tightly, then screw the other two installation bolts at the diagonal position and finally tighten the four installation bolts one by one.

Finally, tighten the tightening bolts. All tightening bolts must be fixed and inspected by the torque plate hand according to the specified fixed torque data. The correct installation between the reducer and the mechanical equipment is similar to the correct installation between the reducer and the drive motor. The key is to ensure that the output shaft of the reducer coincide with the concentricity of the shaft being driven.

Contact
Hotline

400-026-9834

网站资料更新中...